Precautions
How to avoid being unable to remove the T-leveller
①Leaving the seam 1.5mm can directly use the leveler to leave the seam, if you need to leave the seam 2mm or more (must be used with the cross card provided by our store)
②When leveling, the steel needle is rotated left and right, and the surrounding cement must be cleaned.
③Do not fill the brick joints with cement, otherwise, if it is taken late, the cement will dry out. The needle cannot be pulled out
④After 4-6 hours of leveling, it must be before the cement or tile glue is dry. Take out the leveler
⑤ When removing, you can press the needle down first to reduce the frictional resistance between the tile and the tile